Yorkshire & North East 01274 874 772 North West 01925 820 828
Logo

With you at every stage

  • Home
  • About
  • Projects
  • On Site
  • News
  • Vacancies
  • Contact
  • Civils
  • Commercial
  • Education
  • Healthcare
  • Industrial
  • Listed Building & Conservation
  • Local Authority & Emergency Services
  • Residential
  • Retail
  • Sport & Leisure
  • Student Accommodation
  • Civils
  • Commercial
  • Education
  • Healthcare
  • Industrial
  • Listed Building & Conservation
  • Local Authority & Emergency Services
  • Residential
  • Retail
  • Sport & Leisure
  • Student Accommodation

Education

Download Brochure
SKYLINE LIBRARY – LEEDS COLLEGE OF MUSIC
The creation of a new library by fitting out an existing retail unit, incorporating –   staff facilities, rolling racking and the construction of a new entrance pod. The new development, created by Darnton B3 Architecture, is a new bespoke learning environment created over two stories. The flexible study space has been furnished by WeSpace,…
YORK ST JOHN SPORTS CENTRE
The works comprised the construction of a new sports centre for the University, this scheme predominantly includes new team changing facilities together with officials changing, a new strength and conditioning suite, 5 court sports hall and flexible social space for teaching and social use.    
EATON PRIMARY SCHOOL
The project was undertaken in 2 phases. Phase 1 comprised of a new two storey rear extension to form classrooms, toilets, amenity areas and lift. Phase 2 was for the upgrading and Re-modelling of the existing school with an extension to the hall , kitchen and existing toilets , a single storey extension to the…
UNIVERSITY CATHEDRAL SCHOOL
The scheme comprised of the conversion of a former Grade 11 Listed office building and gatehouse into a free school with associated external works. The works were carried out in three phases. Works included re-configuration of the existing space into classrooms and offices, welfare facilities, including staff rooms and canteens. To create a main hall…
KING DAVID HIGH SCHOOL
The project was for the construction of a new two storey classroom block to include 7 classrooms,1 group room, 1 large hall space, 1 office, 1 reception office, WC facilities and a kitchen area. The construction is steel frame with reinforced concrete floors, facing brickwork and rendered external walls with full height curtain walling to…
Bradford Grammar, Learning Link & Science Block
BRADFORD GRAMMAR SCHOOL
Construction of a new build science block & state of the art learning link.
UNIVERSITY OF BRADFORD – ATRIUM
UNIVERSITY OF BRADFORD – ATRIUM REFURBISHMENT
The project comprised of the internal and external refurbishment and remodelling of the Richmond Building Atrium.
Clarkson Library, Bradford Grammar
CLARKSON LIBRARY, BRADFORD GRAMMAR SCHOOL
Internal and external refurbishment and re modelling of the Clarkson Library
Craven College
CRAVEN COLLEGE, SKIPTON
A new 3 storey teaching facility based on the Aireville campus.
Dearne Highgate Primary School
DEARNE HIGHGATE PRIMARY SCHOOL
The works consisted of a single storey timber frame extension that incorporated 4 classrooms, toilets, kitchen, Head teacher’s office and reception area.
Heckmondwyke Grammar School
HECKMONDWIKE GRAMMAR SCHOOL
This project comprised of a 2 storey steel framed & steel cladding teaching block with a link corridor to connect to the existing school buildings.
Heritage Quay, University of Huddersfield
HERITAGE QUAY, UNIVERSITY OF HUDDERSFIELD
Heritage Quay is the official archive for the University of Huddersfield, acting as the guardian of the archives of other organizations, families and individuals dating back over 200 years.
« Previous 1 2 3 Next »
Construction Line
NHBC Registered house builder
Chas Accredited
NHS Trusts
Considerate Constructors
Considerate Constructors
Considerate Constructors
Considerate Constructors

© 2021 Copyright Triton Construction Ltd Construction

Modern Slavery Statement  |  Webdesign by Vital