PIONEER HOUSE HIGH SCHOOL

Location MANCHESTER

Project Value £2.5M

This project was for a new-build teaching facility (circa 432m² in size), comprising of three classrooms, one large learning/social space, four group working rooms, one office and three external recreation spaces, along with ancillary spaces such as WC’s, storerooms, circulation areas.

A new multi-use games area (MUGA), to replace the existing MUGA which is currently located where the new building is to be sited.

External free-standing canopy.

Re-site existing external gym equipment and other existing furniture.

Formation and installation of a new bicycle shelter to the rear of the existing school building. This includes drainage and N&E supplies. Specialist cycle shelter by Broxap.

Addition work including the refurbishment of the food-tech room within the existing school. Construction of the Bike store.