RMR BUILDING

Location NEWTON AYCLIFFE

Project Value £1.25M

This project was for the construction of a new steel framed Raw Materials Reception building and adjacent concrete service yard.

Project works included the erection of a steel frame, concrete floor slab, external cladding, overhead roller shutter doors and drainage works.

A temporary haul road was required to enable contractors access across waste ground.

As these works took place in the live environment of a busy production plant all deliveries were scheduled to not cause inconvenience to the working of the main plant.

Warren Emerald Biogas Ltd convert food waste collected locally into renewable energy, bio-fertilizer and bio-methane Gas via onside fuel stations, this gas is then used by collection vehicles. The bio-methane produced is also injected into the local Gas Grid, helping to heat local homes and businesses as a renewable alternative to natural gas