NEXT RECYCLING

Location South Kirby, West Yorkshire

Project Value £1.1M

The works consisted of the construction of a new industrial recycling centre, with the mechanical and electrical infra-structure of the client direct supplied specialist equipment.

The industrial portal framed building is over 30,000sqft in size and includes new dock levellers, internal staff facilities and offices.

Externally an extensive new concrete yard and retaining walls with associated drainage have been formed.

As the project was design and build, the works required a significant interface with the clients specialist equipment suppliers in order to design and install the necessary machine bases, pits and M&E supplies.