Weavers Fold

Click photo to enlarge/view gallery

The project consisted of the demolition of an existing petrol station and groundwork remedials, then the construction of nine traditionally built town houses, set back from the A65 at Rawdon near Leeds.
The original proposed strip footing foundation design was not possible given the existing ground conditions, so to progress the project, Triton sourced a piling solution that was carried out with minimum disruption to both cost and programme implications.

A high standard of finish was achieved using NHBC standards.