COCKHEDGE SHOPPING CENTRE

Location WARRINGTON

Project Value £2.6M

This project was for the reconfiguration and refurbishment of Cockhedge Shopping Centre in Warrington. The works took place over three sections.

Unit J, this included a new goods lift, new curtain wall shop fronts new electrical & mechanical supply & installations, fire alarms alterations to external emergency fire escape stairs and modification to external fire escape doors.

Unit F works included full M&E and decorative refurbishment, new curtain walling, builders work included steel frame, forming new openings, forming new plasterboard decorative bulkheads within the centre, all external works, including new block paving, carpark resurfacing & external lighting.

Works at Buzz Bingo included assisting with structural steel frame survey. New car park formation, footpaths with both soft & hard landscaping, decoration to the existing façade and metal cladding to one elevation.

Due to the centre remaining open throughout the entire works, we completed 3 months of night shift working to avoid as much disruption as possible.