CENTRICA

Location South Barrow

Project Value £1.2m

The works comprised the remodelling of an existing workshop, office and storage areas to provide a new Grade B office development. This included the installation of a new first floor mezzanine level within the workshop area and integrated specialist services installations.

The works were carried at an incoming on-shore gas terminal, operating as a top tier COMAH site due to the large quantities of flammable gases and liquids which were on site during normal operations. The works were completed in a demised area within the COMAH site, with strict daily Health & Safety procedures and protocol being adhered to and specialist training undertaken by Triton site management and key staff